Project 27
Project 27: Early January Winter Update 2024
With the start of the new year and the frames sheeted over, to protect them from the elements, the team has started to move forwards on two fronts…
With the start of the new year and the frames sheeted over, to protect them from the elements, the team has started to move forwards on two fronts…
Fenchurch’s boiler has passed its hydraulic test, and boiler fittings are being overhauled and re-attached, as seen in Andy Kelly’s photos below. It is hoped that the loco will be assembled ready for display alongside ‘Stepney’ over the Terrier 150 weekend coming up on 29-31 July…
As a small group, we rely on fundraising to keep achieving our goal of seeing the Bluebell Railways smaller fleet of engines operational. So get on board with us today no matter how large or small the contribution.