Fenchurch 150: Overhaul Update Part 1 August 2022
Andy Kelly’s photos record the passing of the out-of-frames steam test, and bacon being fried in the tradition manner for celebratory bacon brioches. During the Terrier 150 event, the incomplete

Andy Kelly’s photos record the passing of the out-of-frames steam test, and bacon being fried in the tradition manner for celebratory bacon brioches. During the Terrier 150 event, the incomplete

Fenchurch’s boiler has passed its hydraulic test, and boiler fittings are being overhauled and re-attached, as seen in Andy Kelly’s photos below. It is hoped that the loco will be

A second update for June see’s the majority of the boiler work for Fenchurch’s boiler almost complete with only a few additional tasks to be finished off before the boiler

Following on from the start of the year and with the side valances previously set in place after the temporary fitment of the front end for alignment the four valence

With the repair section to the bottom of the boiler welded in and the tube plate set into its final position the front tube plate is finally ready to be

May has seen good progress again on the overhaul work being carried out on Fenchurch for her 150th anniversary later in the year. Statfold Barn has pulled out all the